Feb 27, 2016 – HCH Recreation Center Construction Photos

The following are photos from Feb 26, 2016:

File Feb 26, 12 17 48 PM

Pool table area. The door in the background leads to the back of the building.

File Feb 26, 12 18 31 PM

Business Center Area. There will be a computer and a wireless printer for homeowners and their guests. Tech savvy homeowners and guests will be able to print airline tickets from a smart phone.

File Feb 26, 12 18 55 PM (1)

Pool room.

File Feb 26, 12 22 08 PM

Large indoor hot tub on left. Door to mechanical room in background.

File Feb 26, 12 22 29 PM

Large indoor hot tub. NOTE: windows are covered for painting. Room will appear brighter after painting.

File Feb 26, 12 22 52 PM

Looking out the window towards buildings 23 and 13.

File Feb 26, 12 23 30 PM

Men’s locker room.

File Feb 26, 12 23 48 PM

Locker room

File Feb 26, 12 24 08 PM

Locker room

File Feb 26, 12 24 24 PM

File Feb 26, 12 25 36 PM

ADA shower area. Will be available in both locker rooms. Entire building will meet ADA requirements.

File Feb 26, 12 26 44 PM.jpeg

File Feb 26, 12 27 19 PM

Social Room seating area. There will be a Smart TV above the fireplace.

File Feb 26, 12 27 34 PM

Kitchenette

File Feb 26, 12 27 50 PM

Kitchenette

File Feb 26, 12 28 09 PM

Entry way lighting.

File Feb 26, 12 28 29 PM

Pool table room

File Feb 26, 12 28 46 PM

Outdoor deck. Homeowners and guests will have access to the deck and outdoor hot tub from the indoor pool area.

File Feb 26, 12 29 05 PM

Door from pool area to pavilion area. Homeowners will have access to enter the building through this door with their electronic access card.

IMG_1164

Kids’ Room

IMG_1167

Future fitness room. This room was VE’ed out of the project. We will finish it after we receive our temporary certificate of occupancy.

IMG_1168

Fitness Room

IMG_1170

Fitness Room

File Feb 27, 11 03 21 AM

Laundry room. There will be four stackable washer/dryers and one ADA washer/dryer.

File Feb 27, 11 03 52 AM

Laundry room. Laundry folding tables with building 22 in the background.

File Feb 27, 11 04 32 AM

Laundry room. (Building 3 is shown through the window on the right).

File Feb 27, 11 04 50 AM

Laundry room. There will be a separate entrance to the laundry room that homeowners can use 24/7 with their electronic access card.

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s